Return to the previous step in the scheduling process

Why do it:

This action allows you to go back to the previous screen to review or modify your selections (for example, the event, operator, or date).

Procedure:

1. Locate the navigation button or link that allows you to go back. This element is generally positioned at the top left of the scheduling screen.

2. Click on this element (internally identified as Torna Indietro or arrow).

The system will immediately load the previous step, retaining the information you entered in that step, allowing you to modify it.